Language

Case

Case


1#2# Strip Warehouse Project of Yueyang Hot Metal Container Transportation Coal Reserve Base Project

■ Project name: 1#2# strip warehouse project of Yueyang hot metal container transportation coal reserve base project (Phase I)

■ Construction address: Yueyang Hot Metal Container Coal Reserve Base.

■ Construction scale: The project will build a totally enclosed yard shed, with a single shed length of 531m, a span of 130m and a height of 46.983m, with a total construction area of 166,468.42m2, and the shed structure is pipe truss+color steel plate enclosure structure. The total weight of the pipe truss is about 6,200 tons, and the pipe material of the main structure is Q355B. The project is constructed by in-situ hoisting method.

■ Construction method: in-situ hoisting method.

  

亿万官网企业桌面分销管理客户端软件技术白皮书下载

亿万官网区域代理商加盟通道与招商引资管理平台

亿万官网企业桌面分销管理客户端软件技术白皮书下载



Xuzhou Yuhan steel structure

Years of industry experience accumulation, professional focus on steel structure engineering

更新:2026-08-07 19:04:13 | 链接:https://www.nxxzzm.cn/encase_show.aspx?id=27 | 来源:亿万官网官方指定会员登录入口与客户服务管理系统 - 1#2# Strip Warehouse Project of Yueyang Hot Metal Container Transportation Coal Reserve Base Project-Xuzhou Yuhan Steel Structure Co., Ltd.